NEW FileNet application to search for and download Traffic Plans (sign, signal, and illumination). Click on the links below to access this application.
Note:
FileNet is to be used for reference and historical drawing look-up only. It is the users responsibility to verify that the information is correct and accurate by verifying the information with this office before use.
As of April 11, 2011 the US Department of Transportation Federal Highway Administration has given interim approval to use the alternative Electric Vehicle Charging General Services symbol signs on all roadways in Oregon. A link to the interim approval letter is below.
In addition the FHWA requires ODOT to maintain a list of all EV Charging Symbol Signs installed in Oregon regardless of jurisdiction or maintenance responsibility. If you are installing the EV Charging symbol sign on your facilities, please fill out the information form below and submit it to: jason.motley@odot.state.or.us.
The ODOT Digital Ballbanker spreadsheet is developed to be used with the Rieker® Electronics, Inc. Digital Inclinometer RDS7-BB for use in engineering studies to determine the recommended advisory speed for horizontal curves, per the 2009 Manual on Uniform Traffic Control Devices (MUTCD) Section 2C.08.
If you would like to receive an email notification when updates to the spreadsheet are available, please submit your name and the email address you wish to receive the notification to: eric.s.leaming@odot.state.or.us.
This is a beta version of the spreadsheet – use at your own risk. Please report bugs and user issues to: eric.s.leaming@odot.state.or.us.